Case Study 1:
The Louisiana DOT awarded a $137M job to a construction company to build a two-lane elevated highway. Placement of material handling equipment was limited due to the swampy bayou area. The construction company wanted to place a crawler type crane on a large platform that would be able to move forward as the project progressed. Railroad bogies and other ideas were explored but were deemed too expensive or ineffective...

Case Study 2:
A multi-billion dollar defense and communications company needed a crane manufacturer to custom design cranes that would work in conjunction with their x-ray imaging systems to scan cargo...

Case Study 3:
The South American company was seeking 11 cranes to build barges at a new shipyard facility in Argentina. This project called for a combination of custom designed bridge and gantry cranes. Some of the cranes are magnet cranes requiring a 50% impact factor while the others have a combination of one or more main hoists and an auxiliary hoist. Timing was critical in keeping the new facility on schedule...

Case Study 4:
A multi-billion dollar construction company required a gantry crane to move materials needed to rebuild a section of the I-95 highway, including a 1,000m bridge over Turtle River in Georgia...

Case Study 5:
A multi-million dollar manufacturing company built a new flat bed factory as part of their expansion into the US market. They required numerous cranes from a trusted manufacturer and a quick turnaround...

Case Study 6:
The customer had numerous cranes in multiple locations throughout the United States. With the cranes aging, senior management was committed to having all cranes at all locations inspected for structure & safety...

Case Study 7:
Fort Carson needed to enhance its motor-pool repair facilities...

Case Study 8:
MDS was hired by Rolls Royce to design and construct a jet engine test facility at NASA’s Stennis Space Center. The client needed hooks to be positioned to one eighth of an inch accuracy when lifting $35M jet engines...

   
 